Before drywall, the builder and low-voltage team should agree on where equipment will go, what needs wiring, and how each location will be reached for service. This checklist can help homeowners, architects, and builders review those decisions while there is still time to change the plans.

1. Mark device locations on the drawings

Walk through the floor plan room by room. Mark displays, speakers, keypads, wireless access points, cameras, and door or gate intercoms. Check the locations against ceiling plans, cabinetry, and furniture layouts. A display centered on the wall may still land in the wrong place if the seating or millwork has moved.

2. Choose equipment and network locations

Identify where the equipment rack, router, and network switches will go. Allow space for cable entry, ventilation, power, and service access. Plan wired connections for fixed devices and coordinate wireless access points based on the layout, building materials, and any outdoor areas you want to cover. See structured wiring and home networking.

3. Coordinate lighting and shades with the builder

Decide where keypads should go and which fixtures or rooms need independent control. For motorized shades, confirm window dimensions, power and control requirements, mounting space, and access for service. Coordinate recessed shade pockets before framing and finishes make those details harder to change. Review lighting control and motorized shade planning.

4. Plan the entry and exterior wiring

Walk through the routes residents, guests, and deliveries use. Decide where a camera needs a broad overview and where an intercom or closer view is useful. Confirm pathways to gates and detached structures, and coordinate the intercom with compatible lock or gate hardware. See residential access control.

5. Review the rough-in before drywall

Confirm that cables are labeled and destinations match the current drawings. Review changes made in the field and document any locations that will be concealed. Decide where conduit would make sense for a display, equipment rack, or another route you may need to revisit.

If your project is approaching rough-in, contact Coastal Techworks to review the plans and identify decisions that need to be made before the walls close.